Base Concrete PAD & Bottom Panel Assembly
Wall Panel Asseambly
Internal Tie-Rod & Roof Support Assembly
Assembly Completed
Installation and Caution
Customers are requested to make foundation pad construction according to the designed specifications and the strength of the site.
Check the evenness of foundation (within 5mm) and the flatness of base material. (within 0.5mm)
Check rust of the external reinforced material and any bolts and nuts, their tightness.
check installed state of the external ladders and water level gauge.
check bending of the water tank wall panel(maximum up to 1% of water tank height) and check skewness of the water tank.
Check a corrosion inhibitor coating on the internal reinforced material and bolts tightness.
→